Externally, a risk management program utilizes ______ to protect assets against threats and hazards.
A) Administrative controls
B) Physical and personnel security
C) Society and its legal system
D) Information security
E) All of the above.
Correct Answer:
Verified
Q11: _ is used to track incident and
Q12: _ budgets include measurable units tied to
Q13: Within a budget, items such as utilities,
Q14: Crime Prevention Through Environmental Design can:
A) Prevent
Q15: _ refers to net savings that result
Q17: A cost-benefit analysis is used to:
A) Determine
Q18: A _ plan is designed to ensure
Q19: The _ is a state-based emergency services
Q20: Disaster and emergency planning are: _.
A) Totally
Q21: Risk can be totally eliminated through the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents