For the Buehler Bakery, the desired output for a 8 hour workday is 450 units. The discrete tasks required to produce the product have been identified, timed in seconds, and ordered as indicated in the table.
-Considering there are 7 work centers for the assembly line and assuming 1 worker per work center, calculate the total labor work time.
A) 56 hours per day
B) 50.62 hours per day
C) 45.63 hours per day
D) 40 hours per day
E) Need more information to answer the question
Correct Answer:
Verified
Q71: The table depicts an assembly line that
Q72: The table depicts an assembly line that
Q73: For the Buehler Bakery, the desired output
Q74: For the Buehler Bakery, the desired output
Q75: For the Buehler Bakery, the desired output
Q77: For the Buehler Bakery, the desired output
Q78: For the Buehler Bakery, the desired output
Q79: For the Buehler Bakery, the desired output
Q80: For the Buehler Bakery, the desired output
Q81: For the Buehler Bakery, the desired output
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents