Disruptions to systems can generally be measured by their duration.
Correct Answer:
Verified
Q2: Activation of a resource means that the
Q3: Increasing the capacity of a nonconstraint is
Q4: The constraint management definition for inventory includes
Q5: Constraint management eliminates the emphasis on global
Q6: Nonconstraints must be utilized at 100% to
Q8: The sizing of time buffers should be
Q9: The production batch size for a constraint
Q10: Constraint management provides long term solutions to
Q11: A constraint
A) Is defined as anything that
Q12: The global performance measures that constraint management