Processing waste can be traced to
A) Ineffective job design resulting in excess worker motion.
B) Products that do not meet customer specifications.
C) inventory above that which is necessary.
D) Nonvalue-adding production steps.
Correct Answer:
Verified
Q5: One of the categories of waste targeted
Q6: A kaizen workshop is a one-week marathon
Q7: Kanban systems are best suited for manufacturing
Q8: Reduced changeovers is a necessary pre-requisite to
Q9: For U.S. manufacturers that have embraced lean
Q11: Which of the following statements is accurate
Q12: Which of the following is not a
Q13: The type of waste resulting from ineffective
Q14: The most significant waste-reduction effect of component
Q15: In lean systems, a process focus refers
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents