If a job required three hours each time it was done and was done twice annually, and cost the company $450.00 per hour each time it was done, what error was made by the estimator who determined the total annual cost to be $1,350.00?
A) failed to separate the material costs from labor
B) used the wrong per hour cost
C) divided instead of multiplied
D) used the incorrect number of times performed
Correct Answer:
Verified
Q14: The time required to perform a task
Q15: Which is the best example of a
Q16: Which of the following is NOT likely
Q17: If a company upgraded its equipment by
Q18: To convert the total annual time in
Q20: What is wrong with using bucket loads
Q21: _ is the most precise method of
Q22: A unit cost analysis reduces all dimensions
Q23: The _ of different crews performing the
Q24: Cost variables such as labor, materials, and
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents