Which specifications place almost total responsibility for the choice of materials, methods, and performance standards with the architect, not the contractor?
A) technical
B) performance
C) design
D) construction
Correct Answer:
Verified
Q12: What type of specifications do not allow
Q13: Which specifications allow the contractor the most
Q14: Which specifications are used for parts of
Q15: On a large construction project, where are
Q16: What organization developed Masterformat?
A) Constructions Specifications Institute
B)
Q18: Which specifications permit substitutions after approval by
Q19: What specifications require the use of specific
Q20: What written change modifies the specifications for
Q21: _ is a system that organizes the
Q22: _ specifications often result in lower construction
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents