In lean manufacturing, waste is categorized according to their sources. One of the eight wastes in lean manufacturing identified by company engineers was producing more than required by demand, creating excess inventory and making it difficult to track errors. The term used to represent this type of waste is called:
A) Defects.
B) Excess transporting.
C) Excess waiting.
D) Overproduction.
E) Unnecessary inventory.
Correct Answer:
Verified
Q1: _ is a classic example of a
Q2: Which of the following would not be
Q3: Which of the following would not be
Q4: A component of a MRP system that
Q5: Reduction of waste is central to lean
Q7: Lean manufacturing consists of a set of
Q8: Success in agile manufacturing requires firms to
Q9: For supply chains to be successful, any
Q10: Which of the following statements about omnichannel
Q11: All of the following could be common
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents