
A challenge in buying television spots is
A) long lead time required
B) too many options to choose from
C) coverage flexibility
D) high frequency requirements
E) no demographic selectivity
Correct Answer:
Verified
Q32: The normal length of television commercials is
A)
Q33: A product placement that integrates a product
Q34: A Coca-Cola glass that is highly visible
Q35: An audio recording posted online is called
A)
Q36: Television rates are lowest during
A) prime time
B)
Q38: If overbooking of the available advertising time
Q39: Prime-time television viewing is usually designated as
A)
Q40: When buying television time, the advertiser has
Q41: Rates on a grid card are adjusted
Q42: Radio stations often change their format to
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents