A crew of mechanics at the Highway Department garage repair vehicles that break down at an average of λ = 8 vehicles per day (approximately Poisson in nature). The mechanic crew can service an average of μ= 11 vehicles per day with a repair time distribution that approximates an exponential distribution. The crew cost is approximately $300 per day. The cost associated with lost productivity from the breakdown is estimated at $150 per vehicle per day (or any fraction thereof). Which is cheaper, the existing system with one service crew, or a revised system with two service crews?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q45: Suppose that 1 customer arrives each minute
Q103: A crew of mechanics at the Highway
Q104: At the order fulfillment center of a
Q116: A finite population waiting line model with
Q121: Suppose that a service facility has an
Q122: Suppose that a fast food restaurant wants
Q124: A dental clinic at which only one
Q124: A manufacturing plant is trying to determine
Q127: Suppose that customer arrivals are governed by
Q129: Genco, Inc., a small manufacturer of diesel-generator
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents