A quality analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that when the process is operating as intended, packaging weight is normally distributed with a mean of twenty ounces, and a process standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below.
(a) If he sets an upper control limit of 21 and a lower control limit of 19 around the target value of twenty ounces, what is the probability of concluding that this process is out of control when it is actually in control?
(b) With the UCL and LCL of part a, what do you conclude about this process-is it in control?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q131: A quality analyst wants to construct
Q132: The mean and standard deviations for a
Q133: If μ = 9 ounces, σ =
Q134: Larry's boat shop wants to monitor
Q135: A part that connects two levels
Q137: A small, independent amusement park collects
Q138: Pierre's Motorized Pirogues and Mudboats is setting
Q140: A woodworker is concerned about the quality
Q141: In the table below are selected
Q186: The width of a bronze bar is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents