Balancing a work cell is done:
A) before the work cell equipment is sequenced.
B) as part of the process of building an efficient work cell.
C) before takt time is calculated.
D) so that each assembly line workstation has exactly the same amount of work.
E) to minimize the total movement in a process layout.
Correct Answer:
Verified
Q89: Brandon's computer shop has hired a consultant
Q92: A work cell is scheduled to build
Q93: A work cell is required to make
Q99: A work cell is required to make
Q248: Which of the following is NOT one
Q258: Which of the following is NOT an
Q259: Mathematically, takt time is:
A) total work time
Q261: Identify the four requirements for cellular production.
Q269: "Having a focused work center is like
Q278: A fabrication line and an assembly line
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents