Hemo-tech, Inc., a biomedical technology and research laboratory, produces a standard blood filtering device on an assembly line basis. Six basic tasks are performed along an assembly line. The time to perform each task and the tasks that must immediately precede each task are in the table below. Twenty pumps per 450-minute day must be produced by the assembly line.
a. Draw the network diagram of the precedence relationships.
b. Identify the absolute minimum and maximum cycle times.
c. How many workstations are required to meet the schedule?
d. What is the cycle time required to meet demand?
e. Balance this line using most following tasks heuristic.
f. What is the efficiency of the line obtained in part e?
g. Can the efficiency of this solution be improved?
Explain.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q99: A work cell is required to make
Q149: An airport is trying to balance
Q150: An electronics manufacturer makes remote control
Q151: A work cell is required to make
Q152: A manufacturing work cell has a takt
Q153: Cyclone Appliances has developed a new
Q155: A work cell is required to make
Q156: A firm operates a flow shop
Q157: The flow and distance data in
Q158: A company is trying to balance production
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents