DuLarge Marine manufactures diesel engines for shrimp trawlers and other small commercial boats. One of their CNC machines has caused several problems. Over the past 30 weeks, the machine has broken down as indicated below. Each time the machine breaks down, the firm loses an average of $3,000 in time and repair expenses. If preventive maintenance were implemented, it is estimated that an average of only one breakdown per week would occur. The cost of preventive maintenance is $1,000 per week.
What is the weekly total maintenance cost of this program?
A) $1,000
B) $3,000
C) $4,000
D) $6,000
E) $8,000
Correct Answer:
Verified
Q11: _ is the probability that a machine
Q48: _ is the expected time between a
Q51: The inverse of the mean time between
Q64: Which one of the following is not
Q66: Techniques for enhancing maintenance can include
A) simulation
Q73: DuLarge Marine manufactures diesel engines for
Q83: _ is a plan that involves routine
Q93: _ is the failure rate early in
Q105: _ combines total quality management with a
Q118: The _ takes into account such costs
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents