A quality analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that whenever this process is in control, package weight is normally distributed with a mean of 20 ounces and a standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each:
If he uses upper and lower control limits of 22 and 18 ounces, what is his risk (alpha) of concluding this process is out of control when it is actually in control (Type I error) ?
A) 0.0026
B) 0.0456
C) 0.3174
D) 0.6826
E) 0.9544
Correct Answer:
Verified
Q74: A point which is outside of the
Q76: The following data occurs chronologically from
Q78: _ variation is a variation whose cause
Q78: The following data occurs chronologically from
Q80: Consider the following information:
Q82: A quality analyst wants to construct
Q83: A quality analyst wants to construct
Q84: A quality analyst wants to construct
Q85: A quality analyst wants to construct
Q86: The chair of the operations management
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents