Acceptance testing
A) includes all the preparations for the series of tests to be performed on the system.
B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.
C) tests each program separately.
D) provides the final certification that the system is ready to be used in a production setting.
E) involves testing the conversion of legacy data to the new system.
Correct Answer:
Verified
Q26: In a parallel conversion strategy,the new system
A)is
Q28: Unit testing
A)includes all the preparations for the
Q29: Which process develops a detailed description of
Q30: Systems design
A)describes what a system should do
Q30: _ is the process of changing from
Q32: A systems analysis includes a(n)_ that is
Q33: In what stage of systems development are
Q34: Changes in hardware,software,documentation,or production to a production
Q36: System testing:
A)includes all the preparations for the
Q37: A(n)_ is the model or blueprint for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents