Solved

Poseidon Company Produces Customized Sailboats

Question 71

Essay

Poseidon Company produces customized sailboats.The company uses a job order costing system.Its plant has three production departments: cutting,machining,and assembly.The estimated manufacturing overhead cost and direct labor cost for each department for 2011 follow:
Cutting Machining Assembly
Poseidon Company produces customized sailboats.The company uses a job order costing system.Its plant has three production departments: cutting,machining,and assembly.The estimated manufacturing overhead cost and direct labor cost for each department for 2011 follow: Cutting Machining Assembly   In May 2011,the company received an invitation from Duluth Sailing Company to bid on an order of five luxury sailboats that must be delivered by the end of September 2011.This Duluth Job would require direct manufacturing costs in the three departments as follows:   Required: a. Assume that a single,plantwide predetermined manufacturing cost driver rate based on direct labor cost is used.Determine the manufacturing cost driver rate and manufacturing overhead costs applied to the Duluth Job. b. Assume that separate,departmental predetermined manufacturing cost driver rates based on direct labor cost are used in each department.Determine the departmental manufacturing cost driver rates and manufacturing overhead costs applied to the Duluth job. c. Assume that Poseidon has a policy to add a 60% markup to estimated job costs to arrive at the bid price. Determine the bid price for the Duluth job using: 1.a plantwide manufacturing overhead cost driver rate; and 2.departmental manufacturing overhead cost driver rates. d. Review the bid prices computed in (c).Why do the two bids differ? e. What are the possible consequences of overbidding a job? Underbidding a job?
In May 2011,the company received an invitation from Duluth Sailing Company to bid on an order of five luxury sailboats that must be delivered by the end of September 2011.This Duluth Job would require direct manufacturing costs in the three departments as follows:
Poseidon Company produces customized sailboats.The company uses a job order costing system.Its plant has three production departments: cutting,machining,and assembly.The estimated manufacturing overhead cost and direct labor cost for each department for 2011 follow: Cutting Machining Assembly   In May 2011,the company received an invitation from Duluth Sailing Company to bid on an order of five luxury sailboats that must be delivered by the end of September 2011.This Duluth Job would require direct manufacturing costs in the three departments as follows:   Required: a. Assume that a single,plantwide predetermined manufacturing cost driver rate based on direct labor cost is used.Determine the manufacturing cost driver rate and manufacturing overhead costs applied to the Duluth Job. b. Assume that separate,departmental predetermined manufacturing cost driver rates based on direct labor cost are used in each department.Determine the departmental manufacturing cost driver rates and manufacturing overhead costs applied to the Duluth job. c. Assume that Poseidon has a policy to add a 60% markup to estimated job costs to arrive at the bid price. Determine the bid price for the Duluth job using: 1.a plantwide manufacturing overhead cost driver rate; and 2.departmental manufacturing overhead cost driver rates. d. Review the bid prices computed in (c).Why do the two bids differ? e. What are the possible consequences of overbidding a job? Underbidding a job?
Required:
a. Assume that a single,plantwide predetermined manufacturing cost driver rate based on direct labor cost is used.Determine the manufacturing cost driver rate and manufacturing overhead costs applied to the Duluth Job.
b. Assume that separate,departmental predetermined manufacturing cost driver rates based on direct labor cost are used in each department.Determine the departmental manufacturing cost driver rates and manufacturing overhead costs applied to the Duluth job.
c. Assume that Poseidon has a policy to add a 60% markup to estimated job costs to arrive at the bid price. Determine the bid price for the Duluth job using:
1.a plantwide manufacturing overhead cost driver rate; and
2.departmental manufacturing overhead cost driver rates.
d. Review the bid prices computed in (c).Why do the two bids differ?
e. What are the possible consequences of overbidding a job? Underbidding a job?

Correct Answer:

verifed

Verified

a. Plantwide overhead cost rate is 150% ...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents