Which of the following statements about the work breakdown structure (WBS) is not true?
A) The WBS provides a hierarchical structure that outlines the activities or work that needs to be done in order to complete the project scope.
B) The WBS should support the project's MOV
C) The WBS should be developed by the project manager.
D) The WBS provides a framework for developing a tactical plan to structure the project work.
E) The WBS provides a bridge or link between the project's scope and the detailed project plan
Correct Answer:
Verified
Q49: An estimation technique characterized by picking numbers
Q50: _ is the most common, real-world method
Q51: Which of the following processes of Scope
Q52: The Work Breakdown Structure is subdivided into
Q53: Continuously agreeing to project changes is an
Q55: _ can be a very effective estimating
Q56: An estimation technique characterized by schedule and
Q57: With _, activity estimates are usually provided
Q58: The _ estimation method usually costs more
Q59: An estimation technique characterized by the dividing
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents