Assume the following activities for a project along with their estimated durations and predecessors.Describe how critical path analysis would be applied to this project, and calculate the critical path.Define the concepts: slack/float, expedite/crash, and fast tracking and explain what their implications are for this project?
Correct Answer:
Verified
Q71: What is the difference between crashing and
Q72: How can parallel activities help shorten the
Q73: Define the following and give a real
Q74: How does the work breakdown structure (WBS)
Q75: Why should the project manager ensure that
Q77: What is a baseline plan?
Q78: What does prorating the cost of a
Q79: Why should assumptions used in estimating be
Q80: What is the critical chain? How is
Q81: Describe the five steps that comprise the