In a(n)____________________,the old system is discarded and the new one takes over the entire business operation for which it was developed.
Correct Answer:
Verified
Q62: _is a graphical standard for visualizing,specifying,and documenting
Q63: What does a technical feasibility study entail?
Q66: _ includes two main responsibilities: maintenance and
Q66: _takes place when an operation switches from
Q68: _consists of diagrams that describe the following
Q69: A cut-over conversion is also called _conversion.
Q71: List the five-steps that the systems analysis
Q71: List the steps included in IT planning.
Q72: A(n) _uses only four symbols: external entities,processes,data
Q73: How is parallel conversion implemented?
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents