
The balances in the variable overhead control account and the variable overhead control account are $120,000 and $125,000 respectively. The variable overhead spending variance is $6,000 and the variable overhead efficiency variance is $11,000. Which of the following entries would be required to record the variances in a standard costing system?
A)
B)
C)
D)
Correct Answer:
Verified
Q67: All of the following are possible causes
Q68: Briefly explain the meaning of the variable
Q69: Marshall Company uses a standard cost system.
Q70: Tightly budgeted machine time standards can lead
Q71: When variances are immaterial, which of the
Q73: Comfort Company manufactures pillows. The 2015 operating
Q74: The variable overhead efficiency variance is the
Q75: Causes of a favorable variable overhead efficiency
Q76: Managers can always view a favorable variable
Q77: Osium Company made the following journal entry:
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents