
Assume the following:
WIP, beginning 4500 units (100% complete as to direct materials, 40% complete as to conversion costs)
Started 12,500 units during the period
Total spoilage is 800 with normal spoilage is calculated to be 350 units
Completed and transferred out during the period 10,000 units
WIP, ending 6200 units (100% complete as to direct materials, 50% complete as to conversion costs)
Spoiled units 800 and inspection happens when the process is 30% complete
All materials are added at the start of the process
Under the weighted average method, would would be the equivalent units of work done for the period?
A) 9405
B) 10,000
C) 6200
D) 13,340
Correct Answer:
Verified
Q88: Cost of spoiled units equals _.
A) all
Q89: Weather Instruments assembles products from component parts.
Q90: To simplify calculations under FIFO, spoiled units
Q91: The Duolane Pottery manufactures pottery products. All
Q92: Normal spoilage costs are usually deducted from
Q94: When spoiled goods have a disposal value,
Q95: Which of the following statement is true
Q96: 700 shirts are sold as seconds at
Q97: Maxire Shoes manufactures shoes. All direct materials
Q98: Harriet has been reviewing the accounting system
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents