Ventaz Corp manufactures small windows for back yard sheds. Historically, its demand has ranged from 30 to 50 windows per day with an average of 43. Alex is the one production worker and he works eight hours a day, five days a week. Each order is one window and each window takes 5 minutes.
What is the average waiting time in minutes?
A) 2.50
B) 4.06
C) 2.03
D) 21.50
Correct Answer:
Verified
Q106: A time driver is any factor that
Q107: In the formula for calculating the average
Q108: Ventaz Corp manufactures keyboards. The manufacturing cycle
Q109: The tool crib at a large manufacturing
Q110: The tool crib at a large manufacturing
Q112: The time from which a machine setup
Q113: Two common operational measures of time are
Q114: The average waiting time is the average
Q115: Customer response time is the time it
Q116: Alex is injured and rushed to Care
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents