Ventaz Corp manufactures small windows for back yard sheds. Historically, its demand has ranged from 30 to 50 windows per day with an average of 43. Alex is the one production worker and he works eight hours a day, five days a week. Each order is one window and each window takes 7 minutes. Alex plans to add doors to its product line and anticipates that they will average 2 doors per day. Each door takes V4 minutes to install.
What is the average waiting time, in minutes, if Alex continues to be the only worker?
A) 220 minutes
B) 289 minutes
C) 241 minutes
D) 963 minutes
Correct Answer:
Verified
Q112: The time from which a machine setup
Q113: Two common operational measures of time are
Q114: The average waiting time is the average
Q115: Customer response time is the time it
Q116: Alex is injured and rushed to Care
Q118: Manufacturing lead time is the sum of
Q119: The tool crib at a large manufacturing
Q120: Manufacturing Cycle Efficiency (MCE) = Value-added Manufacturing
Q121: One of the ways to increase capacity
Q122: Longer manufacturing cycle times can result in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents