Speedy Dress Manufacturing has two workstations, cutting and finishing. The cutting station is limited by the speed of operating the cutting machine. Finishing is limited by the speed of the workers. Finishing normally waits for work from cutting. Each department works an eight-hour day. If cutting begins work two hours earlier than finishing each day, the two departments generally finish their work at about the same time. Not only does this eliminate the bottleneck, but also it increases finished units produced each day by 210 units. All units produced can be sold even though the change increases inventory stock by 15% from 430 units. The cost of operating the cutting department two more hours each day is $1430. The contribution margin of the finished products is $12 each. Inventory carrying costs are $0.50 per unit per day.
What is the change in the daily contribution margin if the change is made?
A) $684
B) $703
C) $1058
D) $715
Correct Answer:
Verified
Q124: Norton's Convenience store has a variable demand.
Q125: Which of the following is a storage
Q126: Acme Janitor Service has always taken pride
Q127: One way to increase capacity is to
Q128: Identifying and minimizing the sources of non-value-added
Q130: Brown Laundry has a variable demand. The
Q131: The manufacturing cycle including related delays can
Q132: Manufacturing cycle times affect both revenues and
Q133: Which of the following reduces manufacturing cycle
Q134: Longer manufacturing cycle times increase the inventory
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents