An instrument printout reveals the following: PT = 9.0 sec and APTT = 20.0 sec.What should the technologist do next?
A) Report patient results.
B) Check the sample for the presence of small clots.
C) Observe the sample for the presence of hemolysis.
D) Examine the collection tube for underfilling.
Correct Answer:
Verified
Q18: The following 20 hemoglobin results were
Q19: Which hematologic parameters would be affected by
Q20: The purpose of a control material is
Q21: A clinical laboratory professional performed a procedure
Q22: When using moving averages to monitor an
Q24: What is the first step in the
Q25: What are the components of a method
Q26: Moving averages can be used to monitor
Q27: The following CBC results were obtained
Q28: In reviewing a patient's APTT result, the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents