A subdivision is planned for forty houses,each with its own in-ground swimming pool.A contractor estimates it will take him 30 hours to build the first pool and that there is a 90% learning curve associated with this process.
-How long will it take to build the last pool?
A) 27.2 hours
B) 23.9 hours
C) 20.5 hours
D) 17.1 hours
Correct Answer:
Verified
Q1: Which of the following statements about capacity
Q4: The maximum output capability of a system,allowing
Q25: An example of a variable cost is:
A)a
Q31: If a firm cannot make a profit
Q33: The first three rooms took a four-person
Q36: Jimbo Elrod has obtained fixed and variable
Q37: Which of these factors typically does NOT
Q39: Four entrepreneurial students want to open a
Q57: Students arrive at a professor's office every
Q71: Wally's Filling Station is manned by one
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents