Synchronized manufacturing occurs when
A) finite scheduling succeeds in fitting jobs to machines so that flows are continuous.
B) stations are unbalanced.
C) bottlenecks are fed without long queues forming.
D) both a and c
E) all of the above
Correct Answer:
Verified
Q62: Slack is correctly calculated as:
A)(V/Vmax capacity) +
Q63: _ are the inputs that tend to
Q64: Which equipment type is used in jobs
Q65: What can be learned from playing the
Q66: Japanese industry specialized in flow shop capacity
Q68: Stockless materials management systems are basically _
Q69: What is the best definition of breakeven
Q70: Percent capacity utilized can best be measured
Q71: _ developed breakeven charts in the _.
A)Sloan
Q72: As throughput volume gets larger,what factors operate
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents