To reduce wastefulness of queues,the OPT system (optimum production technique,aka optimized production technology,aka the theory of constraints) recommends feeding the bottleneck.
Correct Answer:
Verified
Q7: In the V process,work begins upstream at
Q8: The theory of constraints was not developed
Q9: The final step of production scheduling assigns
Q10: The costs of not making the best
Q11: The average amount of time it takes
Q13: When sequencing models are used,it is assumed
Q14: To create standard hours it is not
Q15: FIFO is an appealing sequencing policy because
Q16: Total flow time is the cumulative time
Q17: Time buffers are the same as stock