Which of the following is TRUE of the mean flow time?
A) It is the average of the complete-to-ship times for every job in the group.
B) It is the average of the wait-to-start and processing times for every job in the group.
C) It is the average of the release times for every job in the group.
D) It is the average of the start-to-finish times for every job in the group.
E) both a and b
Correct Answer:
Verified
Q77: The _ model is based on opportunity
Q78: A criterion that must be satisfied for
Q79: When work is going to be late,or
Q80: On the face of it,the most natural
Q81: _ flow time is composed of the
Q83: The objective function of sequencing models can
Q84: In general,the time scale on the Gantt
Q85: Loading assumes that the material requirements analysis
Q86: When the SMH index is multiplied by
Q87: On the Gantt load chart,bars and lines,running
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents