_____ is done by holding the plumb rule at an angle on the edge of the corner of the brick at the racking point to check the alignment.
A) Returning
B) Racking back
C) Tailing a lead
D) Holding the line
Correct Answer:
Verified
Q1: A good guide for parging is a
Q2: _ provides an extra measure of protection
Q4: _ is the construction of a temporary
Q5: Toothing is used when a corner cannot
Q6: Estimating the number of courses is a
Q7: The terms inside corner and outside corner
Q8: The construction of an inside angle corner
Q9: The sum of the whole bricks used
Q10: The first course of a rack-back lead
Q11: Whole bricks are also called _ .