All load-carrying timber members for scaffolding framing should be _____ construction grade lumber.
A) a minimum of 2000 fiber
B) a maximum of 1000 fiber
C) a maximum of 1500 fiber
D) a minimum of 1500 fiber
Correct Answer:
Verified
Q5: Where persons are required to work or
Q6: According to the 29 CFR 1926, toeboards
Q7: OSHA estimates that as many as _
Q8: Scaffold legs can rest on hollow block.
Q9: The board on which the scaffolding rests
Q10: As a rule, the mason does not
Q11: When building a single section of scaffolding
Q12: Employees should use extreme caution when working
Q14: When scaffolding is higher than two sections,
Q15: Wire, synthetic ropes, or fiber ropes used