Which of the following statements is correct about the reinvestment assumptions that are inherent in the use of the net present value (NPV) method and the internal rate of return (IRR) method?
A) The NPV method assumes that the project's cash flows will be reinvested at the firm's required rate of return, whereas the IRR method assumes reinvestment at the project's IRR.
B) The NPV method assumes that the project's cash flows will be reinvested at the risk-free rate, whereas the IRR method assumes reinvestment at the firm's required rate of return.
C) The NPV method assumes that the project's cash flows will be reinvested at the firm's required rate of return, whereas the IRR method assumes reinvestment at the risk-free rate.
D) The NPV method assumes that the project's cash flows are not reinvested, whereas the IRR method assumes the cash flows are reinvested at the firm's required rate of return.
E) The NPV method assumes that the project's cash flows are reinvested at the firm's required rate of return, whereas the IRR method assumes the cash flows are not reinvested.
Correct Answer:
Verified
Q13: Two firms, Tangerine Inc. and Cyan Inc.
Q14: Which of the following statements is true
Q15: If a project's net present value (NPV)
Q16: Which of the following statements is correct?
A)A
Q17: Which of the following statements best describes
Q19: Which of the following is true about
Q20: Which of the following statements about the
Q21: A project's terminal value is the _.
A)present
Q22: Tangerine Inc. is evaluating a capital project
Q23: A project should be accepted if _.
A)its
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents