Which of the following contributes to high project risk?
A) Probability of failure is low.
B) If the project fails,the results can be easily rectified.
C) The project is fully insured against failure.
D) Consequences of project failure are serious.
Correct Answer:
Verified
Q20: Which of the following is NOT a
Q21: Types of risks that a project can
Q22: Documenting the risk is helpful as a
Q23: Which of the following is NOT a
Q24: Project scheduling is _.
A)the process of converting
Q26: One way to determine the duration of
Q27: Project risk is calculated by _.
A)historical experience
Q28: A project risk refers to _.
A)the potential
Q29: The work breakdown structure (WBS)_.
A)is part of
Q30: Which of the following statements about the