Operations plans in the medium to short term are done during ______.
A) detailed scheduling
B) materials requirement planning
C) sales and operations planning
D) master scheduling
Correct Answer:
Verified
Q8: To facilitate production,it is necessary to _.
A)aggregate
Q9: The output of the master schedule is
Q10: The current time bucket lies in which
Q11: The time intervals used in master scheduling
Q12: A final assembly schedule is a part
Q14: The effectiveness of a master schedule depends
Q15: The planning horizons of master scheduling are
Q16: Which of the following is relevant to
Q17: The master schedule reflects demand from _.
A)final
Q18: A production lot size is scheduled when