ABC,Inc.,is a small clothing manufacturer that produces shirts and pants using two resources: sewing machine hours and cutting machine hours.The production manager can schedule up to 240 hours of sewing machine time and up to 150 hour cutting machine time.Production of one shirt requires 3 hours of sewing time and 1 hour of cutting time.Each pair of pants requires 2 hours of sewing time and 1.5 hours of cutting time.Each shirt yields a profit of $5,and each pair of pants generates a $6 profit.The objective is to maximize profits.Determine the nonnegative constraint for the LP formulation.Let X₁ = Number of shirts to be produced,X₂ = Number of pairs of pants to be produced.
A) X₁ and X₂ > 0
B) X₁ and X₂ ≥ 0
C) X₁ and X₂ ≤ 0
D) X₁ and X₂ = 0
Correct Answer:
Verified
Q1: ABC,Inc.,is a small clothing manufacturer that produces
Q3: All linear programming problems must have _
Q4: Which of the following is a mathematical
Q5: Determining the supply of resources needed to
Q6: ABC,Inc.,is a small clothing manufacturer that produces
Q7: In linear programming,advertising dollars budgeted for a
Q8: The requirement of linear programming is that
Q9: The graphical method is appropriate for solving
Q10: ABC,Inc.,is a small clothing manufacturer that produces
Q11: The limited availability of resources can be
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents