A system that enables plans to be adjusted according to capacity and other requirements by synchronizing material purchase and component production plans with the master schedule and by providing feedback on manufactured items and materials on hand is a ______.
A) closed loop MRP system
B) open loop MRP system
C) closed loop CRP system
D) open loop CRP system
Correct Answer:
Verified
Q80: Which of the following is NOT a
Q81: The process of setting loading limits on
Q82: A system used by companies to systematically
Q83: Which of the following is NOT an
Q84: Which of the following statements is true
Q86: A system that provides a real-time integrated
Q87: Distribution requirements planning (DRP)is also known as
Q88: The DRP process typically begins _.
A)at an
Q89: The process of loading all the work
Q90: Developing MRP plans and schedules by assuming
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents