Alderton suggests telltale signs of project trouble.Match these terms for these signs with their descriptions.
A)Muddy waters
B)Unconstrained constraints
C)Suspicious status reports
D)Discord and drama
1)Knowing how much leeway there is in your schedule and budget for each task,and where delays or cost overruns can be made up,keeps a project out of trouble.
2)Vague or overly optimistic language such as "very soon" or "marginal increase" in costs also indicates trouble ahead.
3)Unhappy team members can cause major trouble in the project.
4)The scope is not well defined or well understood." Vague or incomplete project requirements are a major red flag.
Correct Answer:
Verified
Q39: Which of the following is not a
Q40: In earned value Analysis,BAC refers to the
Q41: (BAC + EV) / CPI = _.
A)EAC
B)TPI
C)CPI
D)ETC
Q42: Identify the main complaints associated with meetings.
Q43: Suggest some practical measures that can be
Q45: When using earned value analysis,identify the three
Q46: Describe the three common difficulties in designing
Q47: List the four conventions used to aid
Q48: There are several conventions used to aid
Q49: ST-AT =
A)TV
B)EV
C)CV
D)SV
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents