master production schedule is an input to a material requirements planning (MRP)system.
Correct Answer:
Verified
Q4: Manufacturing firms maintain bill of materials (BOM)
Q5: MRP is based on dependent demand.
Q6: modular bill of materials is the term
Q11: BOM file is often called a product
Q12: modular bill of materials includes items with
Q12: The deeper one looks into the product
Q13: MRP provides the schedule specifying when each
Q16: The MRP program performs its analysis from
Q17: An output of MRP is a bill
Q18: MRP stands for Material Requirements Planning.