The least unit cost method of lot-sizing adds ordering, stock-out and inventory carrying cost for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.
Correct Answer:
Verified
Q21: Projected available balance is the amount of
Q22: The economic order quantity (EOQ) lot-sizing technique
Q23: The economic order quantity (EOQ) lot-sizing technique
Q24: In a net change MRP program, a
Q25: The lot-for-lot (L4L) lot-sizing technique minimizes carrying
Q30: Lot-for-lot (L4L) is the most common lot-sizing
Q31: The economic order quantity (EOQ) lot-sizing technique
Q32: "Projected available balance" is a term referring
Q35: A lot-for-lot (L4L) lot-sizing technique does not
Q38: Net change MRP reflects the exact status