Use this scenario for the following question(s) .
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
-Refer to the scenario above. What is the theoretical minimum number of stations that will be used if the line is balanced using the appropriate takt time?
A) 3
B) 4
C) 5
D) 6
Correct Answer:
Verified
Q68: Name two restaurants that score differently on
Q69: Use this scenario for the following
Q70: The table depicts a production line
Q71: The table depicts an production line
Q72: Use this scenario for the following
Q74: Where should a business consultant position herself
Q75: Use this scenario for the following
Q76: Champion Cooling has just signed a
Q77: Which poses the greatest underlying managerial challenges
Q78: Define the terms front room and back
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents