Consider the adjacent work stations in this two card Kanban system.Work Center 3 has just pulled the Incoming Parts C box to their work station.What happens to the cards in the Incoming Parts C box and at the work station?
A) The move card at their station goes in the Incoming Parts C box and the production card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to produce material.
B) The production card at the station is passed back to Work Center 2 as a signal to produce more material and the move card is left at Work Center 3 to signal that they are ready to accept materials when they are complete at Work Center 2.
C) The move card at their station goes in the box they will send downstream to Work Center 4 and the production card is placed at the Work Center 3 station while they are working on this batch of material.
D) The production card at their station goes in the Incoming Parts C box and the move card is pulled from the Incoming Parts C box to signal the worker at Work Center 2 that there is a need to move material.
Correct Answer:
Verified
Q38: In the water and rocks analogy for
Q39: A pull system is a production system
Q42: Livernonions Industries uses a kanban system to
Q44: Consider the adjacent work stations in this
Q45: In a single-card kanban system:
A)the single card
Q49: Liversuch Industries uses a kanban system to
Q51: Livermore Industries uses a kanban system to
Q65: The greater the demand, the more kanbans
Q70: Companies that use MRP and kanban together
Q75: Under two-card kanban system rules, each box
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents