Consider the adjacent work stations in this two card Kanban system.Work Center 3 has just pulled the Incoming Parts C box to their work station.Plant manager Taichi Ohno grabs the microphone for the company PA system and announces that effective immediately,the company will switch to a one card system.Which of these actions is appropriate?
A) The production card will be discarded and the empty container will function as a production signal.
B) The move card will be discarded and the empty container will function as a move signal.
C) Both the move and production cards will be discarded in favor of a combined move/production card.
D) The production card will be discarded as production will be implied and the move cards will signal when items are needed downstream.
Correct Answer:
Verified
Q31: In a two-card kanban system:
A)the production card
Q47: Olivia has had enough of the theoretical
Q51: Consider the adjacent work stations in this
Q52: In a two-card kanban system:
A)each box of
Q54: When using MRP and kanban together:
A) the
Q55: Consider the adjacent work stations in this
Q63: A manufacturer waits to produce until they
Q64: A(n)_ is a production control approach that
Q68: The number of kanbans in a production
Q70: Companies that use MRP and kanban together
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents