The ambitious sprinkler system project was finally over and it was hard to believe that it took only two years.The project manager leaned back in his office chair and admired his emerald green lawn and flower garden that was filling in nicely.He was amused by the birds that had gathered to bathe and drink at a persistent puddle just outside his window,a harbinger of the first major repair of his own shoddy workmanship.His review of receipts for the job was less entertaining;between trips to the local home improvement store,consultations with plumbers,city inspectors,and some hired labor,he had sunk a small fortune into his lawn.The manager's:
A) Historical records made for interesting reading.
B) Post-project analysis would someday appear in Better Housekeeping.
C) Financial closeout would be forever hidden from his wife.
D) Project plan was a document for the ages.
Correct Answer:
Verified
Q85: Which step in project management requires project
Q86: What is the purpose of controls? Describe
Q87: What is configuration management and why is
Q88: Closeout documentation that follows a formal reporting
Q89: If viewed from a flow standpoint,the stage
Q91: The project closeout step requires project managers
Q92: The project's scope fixed at a specific
Q93: Project closeout documentation that can be used
Q94: The stage of configuration management where the
Q95: A baseline is the project's scope fixed
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents