The project team toiled long into the night to develop consequence of failure scores and probability of failure scores as indicated below.What is the overall risk factor for the project?
A) Less than or equal to 0.7
B) Greater than 0.7 but less than or equal to 0.8
C) Greater than 0.8 but less than or equal to 0.9
D) Greater than 0.9
Correct Answer:
Verified
Q40: The mouse executive board meeting was drawing
Q41: If a project requires a large up-front
Q42: What are any four common categories of
Q43: Use the failure probability and consequence
Q44: The overall consequence of failure was 0.4
Q46: Your project team is interested in determining
Q47: The consequences of failure categories of cost,schedule,reliability,and
Q48: The PostHoc Company specializes in justifying decisions
Q49: Sketch a 2 × 2 risk management
Q50: If the risk of a negative outcome
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents