Process design is required only when new products or services are planned.
Correct Answer:
Verified
Q9: Flexible automation consists of high-cost specialized equipment
Q10: A disadvantage of automation is that it
Q11: The first step in process design is
Q12: The use of operational processes is intermittent
Q13: In general,batch process systems require a more
Q15: A cafeteria line would be an example
Q16: Flexible manufacturing systems (FMS)are intended to automate
Q17: Repetitive process systems are typically used to
Q18: The use of robots is one form
Q19: Production process design is not part of