The cycle time (CT) necessary in a product layout is determined by:
A) number of workstations/sum of task times.
B) operating time per day/desired output per day.
C) number of workstations multiplied by the sum of task times.
D) operating time per day multiplied by desired output per day.
E) sum of task times/number of workstations.
Correct Answer:
Verified
Q77: "CIM" stands for which of the following?
A)Customer-integrated
Q78: The incremental approach to process design does
Q79: Which of the following is not an
Q80: Which type of automation is designed to
Q81: Which of the following is not used
Q83: A machine shop is an example of
Q84: Which term is most closely associated with
Q85: Methods used to analyze data for conversion
Q86: The type of layout which is used
Q87: Which of the following is not usually
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents