A load chart only designates the total load for work centres not the timing of jobs.
Correct Answer:
Verified
Q4: A schedule/control Gantt chart can be used
Q5: Backward scheduling is based on working back
Q6: In job scheduling,most loading of work centres
Q8: Priority rules generally assume that a job's
Q11: Sequencing is concerned with the order in
Q14: Scheduling work centre loading must be completed
Q16: Loading refers to the assignment of jobs
Q18: Input/output (I/O)control refers to monitoring changes in
Q19: All priority rules are designed to ensure
Q39: Makespan is the total time needed to