Given the following data for jobs awaiting processing at a manufacturing cell in which jobs are first processed by machine A, then by Machine B:

-In developing the sequence which will minimize make-span,what is the initial job to be placed in the schedule sequence?
Correct Answer:
Verified
Q105: Determine the minimum number of workers needed,and
Q107: Determine the minimum number of workers needed,and
Q108: What is the make-span for the optimum
Q109: Given the following data for jobs awaiting
Q111: What is the sequence which will minimize
Q112: Given the following data for jobs awaiting
Q122: If these jobs were scheduled in the
Q126: When does idle time occur at machine
Q129: If these jobs were scheduled in the
Q131: What is the idle time at machine