What are the control chart upper and lower control limits for an alpha risk of .05?
A) .0272 and .0128
B) .0289 and .0111
C) .029 and .013
D) .0303 and .0097
E) .0332 and .0068
Correct Answer:
Verified
Q85: Using the factors for three sigma control
Q87: What is the sample average range based
Q88: What is the estimate of the mean
Q89: What is the standard deviation of the
Q91: What is the estimate of the standard
Q91: What is the sample mean for machine
Q92: If he uses upper and lower control
Q93: What is the sample proportion of failures
Q95: What are the .95 (5% alpha risk)upper
Q101: What is the estimate of the standard
Unlock this Answer For Free Now!