Pre-control should only be used when process capability is greater than 88 percent of the tolerance.
Correct Answer:
Verified
Q2: Common and special causes of variation must
Q4: The total observed variation in production output
Q6: A p-chart is used with the attribute
Q9: Rolled throughput yield is the proportion of
Q11: Attribute measurement requires a much larger sample
Q12: Process capability indices cannot be computed from
Q15: For variable data,the two important quality measures
Q15: If most of the points on a
Q17: A measurement system may be precise but
Q19: The larger the sample size,the narrower the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents